The Zakučac hydro power plant was constructed in the lower flow of the Cetina River, near Omiš. Zakučac is the largest plant in the Cetina River basin and the largest hydro power plant in Croatia by its installed capacity and potential power production.

Director: Ivica Marušić

General data:

  • location: area of Split-Dalmatia County, municipality of Omiš, on the Cetina River near Omiš
  • type: diversion
  • in-service year:
    • Zakučac I -1962
    • Zakučac II -1981
  • total capacity: 486 MW

Energy data:

  • installed flow: Qi = 220 m3/s (2x50 + 2x60)
  • design head: Ht = 250.4 m
  • turbine installed flow: 486 MW (2x108 + 2x135)
  • maximum annual production: (1980-2008) Emax = 2056 GWh (1980)
  • mean energy equivalent: 0.6 m3/kWh

annual production 2010 2011 2012 2013 2014
electricity

2,430 GWh

1.119 GWh 827 GWh 2127,3
GWh
2004
GWh

Unit turbine year of construction/refurbishment

A 144 MW*

Francis

1961 / 2013

B 108 MW*

Francis

1962 / 2014

C 135 MW

Francis

1979 / 2015

D 135 MW

Francis

1980


*power units under refurbishment
 