HE Lešće


Gorinci
47262 Generalski Stol
tel +385 47 843761
fax +385 47 843760

     

Director: Milan Sabljak

General data:

  • location: Country of Karlovac in the basin of the Kupa River, on the Gojačka Dobra River. Gojačka Dobra is created from the Ogulinska Dobra and Zagorska Mrežnica rivers which are partitioned by Bukovnik and Sabljaki dams serving Gojak HPP. In the upper flow of the Gojačka Dobra the left tributary is the Ribnjak stream and the right tributary is Bistrec stream.  Gojačka Dobra flows into the Kupa at the village of Mahično, 5 kilometers   upstream of Karlovac.
  • type: storage/run-of-riverLesce
  • total capacity: 42,29 MW
  • construction began in 2005

Energy data:

  • installed flow: Qi = 2 x 60 m3/s + 2.7 m3/s
  • net head: H = 38.18 m
  • installed capacity: 42.29 MW
  • maximum annual production: Emax = 52 GWh
annual production 2010 2011 2012 2013 2014
electricity 31 GWh 52 GWh 77
GWh
110,6 GWh 144 GWh
El. energy ABM - - - 7,5 GWh 7,5 GWh

Unit type year of construction/refurbishment
2 x 20.6 MW turbine - Francis, vertical 2010
ABM 1,09 MW turbine - Francis, vertical 2010

 