HomeHrvatskiSite MapContacts
HEP-Proizvodnja d.o.o.
   
 
 

EL-TO Zagreb


(EL TO Zagreb Cogeneration Plant)
Zagorska 1, 10000 Zagreb
tel.: ++ 385 1 30 73 999, fax: ++ 385 1 30 93 944
     

Director: Krešimir Komljenović

General data:

  • location: Zagreb, TreÅ¡njevka
  • type: cogeneration
  • production: electricity and heat
    • f1: natural gas
    • f2: fuel oil
  • total capacity: 86.8 MWe / 439 MW t + 160 t/h
annual production 2010 2011 2012 2013 2014
heat 647,865 MWh 644,929 MWh 622.665 MWh 606.860
MWh
548.249
MWh
process steam 348.375 t 345,129 t 317.665 t 306.451 t 268.742 t
electricity 369 GWh 359 GWh 366 GWh 356 GWh 262,7 GWh

capacity
per Unit
type fuel year of construction
11 MWe thermal unit f1, f2 1970
30 MWe thermal unit f1, f2 1980
2 x 23,9 MWe

combined-cycle cogeneration unit with two gas turbines

f1 1998
64 MW t aux. steam boiler f1, f2 1971
116 MW t aux. hot water boiler f1, f2 1991
116 MW t aux. hot water boiler f1, f2 2010

 
www.hep.hr HEP Group Pravne napomene/legal noticies Legal notices
Member of HEP Group , Ulica grada Vukovara 37, 10000 Zagreb, tel: + 385 1 61 71 084 , fax: + 385 1 61 72 016